Hampton Wind Park | |
---|---|
Location of Hampton Wind Park in New South Wales | |
Country | Australia |
Location | Near Lithgow, New South Wales |
Coordinates | 33°38′59″S 150°3′0″E / 33.64972°S 150.05000°E / -33.64972; 150.05000 |
Status | Operational |
Commission date | 20 September 2001 |
Construction cost | A$2.4 million |
Owner | Hampton Wind Park Company |
Operator | Hampton Wind Park Company |
Wind farm | |
Type | onshore |
Hub height | 50 m (164 ft) |
Rotor diameter | 47 m (154 ft) |
Rated wind speed | 28.4 revolutions per minute |
Power generation | |
Units operational | 2 X 660kW |
Make and model | Vestas: V47 |
Nameplate capacity | 1.32 MW |
Annual net output | 3 GW hours |
[edit on Wikidata] |
The Hampton Wind Park is a wind power station near Hampton, south-east of Lithgow, New South Wales, Australia. Initiated, developed and operated privately by a landholder, the farm has two wind turbines, with a total nameplate capacity of 1.32 MW of renewable electricity which is supplied to the main electricity grid.
Technical information
Wind Corporation Australia, an energy development company, was established in 2000 by founding investor CVC REEF Limited to develop and commission the Hampton Wind Park. Project cost was A$2.4 million, funded by an investment by CVC-REEF and the NSW Sustainable Energy Development Authority (SEDA).
Opened in September 2001, the wind farm reduces greenhouse gases by 3,000 tonnes each year over the 20 year life of the project, compared to the equivalent electricity generation from coal. The wind turbines are Vestas V47-660 kW models, with 50 metres (160 ft) hub height and 47 metres (154 ft) rotor diameter.
The wind farm's output feeds the grid, and creates renewable energy credits which Integral Energy sells to its Green Power subscribers.
Gallery
- Hampton Wind Park audio/video
See also
References
- ^ "Hampton Wind Park". Clean Energy Council. 2011. Archived from the original on 6 March 2012. Retrieved 17 December 2011.
- "Wind Corporation Australia". Portfolio. CVC REEF Limited. 2007. Archived from the original on 10 January 2012. Retrieved 17 December 2011.
- "Wind farm takes off". News. SKM Consulting. September 2001. Archived from the original on 13 June 2012. Retrieved 17 December 2011.