Archer Point Wind Farm
CountryAustralia
LocationArcher Point, Queensland
Coordinates15°34′48″S 145°18′36″E / 15.58000°S 145.31000°E / -15.58000; 145.31000
StatusProposed
OwnerYuku-Baja-Muliku Corporation
Wind farm
Type
Site area2300 ha
Power generation
Units operational60
Nameplate capacity100–120 MW
[edit on Wikidata]
Archer Point, Queensland

The Archer Point Wind Farm, alternatively Jalunji Wind Park or Cooktown Wind Farm, is a proposed wind farm to be located at Archer Point, about 15 km south of Cooktown, Queensland. It is expected to cost A$250 million to construct.

The wind farm is envisioned to have 60 wind turbines in Stage 1. The total generation capacity for Stage 1 would be 138 MW. This would be enough electricity generation to power the entire Cape York Peninsula while supplementing the electricity needs of Port Douglas and Cairns. Archer Point is recognised as one of the windiest places in Queensland.

The project would generate about 884 GWh of electricity annually – enough electricity to power over 80,000 average Queensland homes. In addition, the wind farm would make a very significant contribution to reducing greenhouse gas emissions in Queensland – reducing electricity emissions by over 370,000 tonnes of greenhouse gas emissions annually. This would be equivalent to taking 85,000 cars off the road. Once constructed, the wind farm would have twice the capacity of the largest renewable energy generation facility in Queensland. Towers are expected to be 80 m high.

In May 2011, it was announced that a lease agreement between the traditional land owners and National Power has been reached.

Installation of the project is touted to take place in late 2025.

See also

References

  1. ^ "Solar Products & Services References: Archer Point". Eco-Kinetics. Archived from the original on 26 March 2012. Retrieved 28 June 2011.
  2. ^ Heather Beck (12 May 2011). "Cooktown one step closer to wind farm". The Cairns Post. Retrieved 28 June 2011.
  3. Kerrie Sinclair (10 May 2008). "$250m wind power plan for Queensland". The Courier-Mail. Retrieved 28 June 2011.
  4. "Archer to deliver Culzean floating wind platform". 6 September 2024.
Wind farms in Australia
New South Wales Wind farm outside of Port Fairy, Victoria
Queensland
South Australia
Tasmania
Victoria
Western Australia
Proposed wind farms
Energy in Queensland
Proposed power stations
Coal
Gas/kerosene
Major hydro
Minor hydro
Wind farms
Solar power stations
Companies
Regulators
Market operator
Historical
List of power stations in Queensland
Categories:
Archer Point Wind Farm Add topic