Misplaced Pages

Chikkajala metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Future Namma Metro station under Blue Line

Chikkajala
Namma Metro station
Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationSurvey No 70/10, A2, Bellary Rd, Chikkajala, Bengaluru, Karnataka 562157
Coordinates13°10′09″N 77°37′54″E / 13.16929°N 77.63179°E / 13.16929; 77.63179
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusCurrently axed from Blue Line & converted to Future Station
Station code(TBC)
History
Opening(TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Bagalur Crosstowards Krishnarajapura or Central Silk Board Blue Line(Future Service and skipping Bettahalasuru) Doddajalatowards KIAL Terminals
Route map
Legend
Yellow Line towards RV Road
Central Silk Board
Yellow Line
Under construction
HSR Layout
Red Line towards Hebbala
Agara
Red Line
Proposed
Ibbaluru
Red Line
Proposed
Red Line towards Sarjapura
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways Towards UpperLeft arrow Hosur and
LowerRight arrow Banaswadi or Baiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
Krishnarajapura Krishnarajapuram railway station Purple Line
Indian Railways Towards Left arrow Krishnarajapuram and
Down arrow Yelahanka Jn or Bengaluru Cantt. Right arrow
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura Orange Line
Red Line towards Sarjapura Up arrow
Orange Line to JP Nagar 4th Phase Right arrow
Hebbala Hebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Indian Railways Towards
Left arrow KSR Bengaluru and Yelahanka Jn Right arrow
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Indian Railways Towards
Left arrow Kolar and Yelahanka Jn Right arrow
Mainline rail interchange Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Location

Chikkajala is a future elevated metro station on the north–south corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station will consist of the main Chikkajala village which holds the main Chikkajala Fort Ruins followed by prime locations like Decathlon Anubhava Sports Arena, Chikkajala Police Station and Chikkajala Lake. This metro station will not be operational on June 2026 due to lack of funds.

Station layout

Station Layout - To Be Confirmed

Chikkajala track layout (TBC)
Legend
to Doddajala
P#P#
to Bagalur Cross **
Station with two tracks and two side platforms
**Skipping Bettahalasuru
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → KIAL Terminals
Next Station: Doddajala
Platform #
Southbound
Towards ← Krishnarajapura / Central Silk Board
Next Station: Bagalur Cross (Skipping Bettahalasuru)
Side platform | Doors will open on the left Disabled access
L2

Connections

This section is empty. You can help by adding to it. (December 2023)

Entry/Exit

This section is empty. You can help by adding to it. (December 2023)

See also

Portals:

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. Lalitha, S. (16 September 2024). "Chikkajala, Bettahalasur stations axed from Metro Airport Line". The New Indian Express. Retrieved 17 October 2024.
  3. Vivan, Sridhar (18 September 2024). "Uncertainty clouds Bettahalsuru, Chikkajala Metro project". Bangalore Mirror. Retrieved 17 October 2024.
  4. vinaykumar.patil. "Bengaluru: BMRCL drops two stations on Airport line amid funding shortfall". Asianet News Network Pvt Ltd. Retrieved 17 October 2024.
  5. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.

External links

  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
Namma Metro
Blue Line 5
Phase-2A
Phase-2B
Not In scope
Depot(s)
  • Baiyappanahalli & Doddajala
See also
*Stations in italics are Under Construction
Categories:
Chikkajala metro station Add topic