Upcoming Namma Metro interchange station for Blue and Red Lines

Agara
Namma Metro station
Under Construction of this metro station as of April 2024 under Phase 2A of Blue Line of Namma Metro
General information
LocationAH45, Agara Village, 1st Sector, HSR Layout, Bengaluru, Karnataka 560034
Coordinates12°55′14″N 77°38′37″E / 12.92053°N 77.64359°E / 12.92053; 77.64359
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
Red Line (Proposed)
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Side platform (TBC)
Platform-3 → Hebbala
Platform-4 → Sarjapura
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsBus interchange Agara BMTC Bus Terminus
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
Status  Under Construction
  Proposed
Station codeAGRA (TBC)
History
Opening  June 2026; 16 months' time (June 2026) (TBC)
  2030; 5 years' time (2030) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
HSR Layouttowards Central Silk Board Blue Line(Future Service) Ibbalurutowards Krishnarajapura or KIAL Terminals
Jakkasandratowards Hebbala Red Line(Proposed) Ibbalurutowards Sarjapura
Route map
Legend
Yellow Line towards RV Road
Central Silk Board
Yellow Line
Under construction
HSR Layout
Red Line towards Hebbala
Agara
Red Line
Proposed
Ibbaluru
Red Line
Proposed
Red Line towards Sarjapura
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways Towards UpperLeft arrow Hosur and
LowerRight arrow Banaswadi or Baiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
Krishnarajapura Krishnarajapuram railway station Purple Line
Indian Railways Towards Left arrow Krishnarajapuram and
Down arrow Yelahanka Jn or Bengaluru Cantt. Right arrow
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura Orange Line
Red Line towards Sarjapura Up arrow
Orange Line to JP Nagar 4th Phase Right arrow
Hebbala Hebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Indian Railways Towards
Left arrow KSR Bengaluru and Yelahanka Jn Right arrow
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Indian Railways Towards
Left arrow Kolar and Yelahanka Jn Right arrow
Mainline rail interchange Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Legend
Blue Line towards KIAL Terminals
Hebbala
Blue Line
Orange Line
Indian Railways Towards
Left arrow Yesvantpur Jn or SMVT Bengaluru UpperRight arrow
Ganga Nagar
Veterinary College
Mekhri Circle
Guttahalli Palace
Bengaluru Golf Course
Basaveshwara Circle
KR Circle
Town Hall
Shanthinagar
NIMHANS
Dairy Circle
Pink Line
Under construction
Koramangala II Block
Koramangala III Block
Jakkasandra
Blue Line towards
Central Silk Board
Agara
Blue Line
Under construction
Ibbaluru
Blue Line
Under construction
Blue Line towards
Krishnarajapura or KIAL Terminals
Bellandur Gate
Kaikondrahalli
Doddakannelli
Indian Railways Towards
Left arrow Hosur or Baiyyappanahalli Right arrow
Carmelaram
Ambedkar Nagar
Kodathi Gate
Muthanalluru Cross
Dommasandra
Sompura
Kada Agrahara Road
Mainline rail interchange Sarjapura Depot (TBC)
Sarjapura
Location

Agara is an upcoming elevated metro station on the North-South corridor of the Blue Line and proposed Red Line of Namma Metro in Bangalore, India. Around this metro station holds the main Agara, a major suburban area which was operated by the Madras Engineer Groups and was one of the biggest army cantonments during the British Times. This metro station is adjacent to its neighbouring localities like HSR Layout, Koramangala, Outer Ring Road and Varthur. This metro station (under Blue Line) is slated to become operational around June 2026.

History

Blue Line

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Agara metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Blue Line Station Layout - To Be Confirmed

Agara track layout (TBC)
Legend
to Ibbaluru Red Line **
P#P#
to HSR Layout *
Station with two tracks and two side platforms
** Proposed & * Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Krishnarajapura / KIAL Terminals
Next Station: Ibbalur
Change at the next station for Red Line
Platform #
Southbound
Towards ← Central Silk Board
Next Station: HSR Layout
Side platform | Doors will open on the left Disabled access
L2

Red Line Station Layout - To Be Confirmed

Agara track layout (TBC)
Legend
to Jakkasandra *
P#P#
to Ibbaluru Blue Line **
Station with two tracks and two side platforms
* Proposed & ** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Hebbala
Next Station: Jakkasandra
Platform #
Southbound
Towards ← Sarjapura
Next Station: Ibbaluru
Change at the next station for Blue Line
Side platform | Doors will open on the left Disabled access
L2

Connections

This section is empty. You can help by adding to it. (January 2025)

Entry/Exit

This section is empty. You can help by adding to it. (January 2025)

See also

Portals:

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  6. "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.

External links

Namma Metro
Blue Line 5
Phase-2A
Phase-2B
Not In scope
  • ** Line(s) and stations which are approved & under construction
Red Line 7 **
  • Hebbala
  • Ganga Nagar
  • Veterinary College
  • Mekhri Circle
  • Guttahalli Palace
  • Bengaluru Golf Course
  • Basaveshwara Circle
  • KR Circle
  • Town Hall
  • Shanthinagar
  • NIMHANS
  • Dairy Circle
  • Koramangala II Block
  • Koramangala Ill Block
  • Jakkasandra
  • Agara
  • Ibbaluru
  • Bellandur Gate
  • Kaikondrahalli
  • Doddakannelli
  • Carmelaram
  • Ambedkar Nagar
  • Kodathi Gate
  • Muthanalluru Cross
  • Dommasandra
  • Sompura
  • Kada Agrahara Road
  • Sarjapura
Depot(s)
  • Baiyappanahalli & Doddajala
  • Sarjapura (TBC)
See also
*Stations in italics are Under Construction
Categories:
Agara metro station Add topic