(Redirected from Stride S3 Line) Future bus network in the Seattle area
Stride
Overview
OwnerSound Transit
Area servedSeattle metropolitan area
Transit typeBus rapid transit
Number of lines3
Number of stations25
Operation
Operation will start2028 (S1 Line and S3 Line)
2029 (S2 Line)
Number of vehiclesArticulated and double-decker buses
Headway10–15 minutes
Technical
System length46 miles (74 km)

Stride is a future bus rapid transit (BRT) service managed by Sound Transit in the Seattle metropolitan area of Washington in the United States. It will comprise three lines that cover 46 miles (74 km) and 25 stations on Interstate 405 (I-405) and State Route 522 (SR 522) in King and Snohomish counties. The system will primarily serve the Eastside region and is scheduled to open in 2028 and 2029.

The three BRT lines will replace existing Sound Transit Express regional bus routes that were launched by Sound Transit between 1999 and 2002. A network of direct access ramps were constructed on I-405 to connect the existing high-occupancy vehicle lanes (HOV lanes) to new bus stations and flyer stops. Plans to upgrade the express buses into a BRT system emerged as part of long-range planning for the I-405 corridor in the 1990s and included in Sound Transit plans the following decade.

Funding for the I-405 BRT lines, along with the addition of the SR 522 corridor, was part of the Sound Transit 3 ballot measure that was passed by voters in 2016. The S1 and S2 lines on I-405 will use median stations in the freeway, accessed from the high-occupancy toll lanes (HOT lanes); the S3 Line will have conventional bus lanes and business access and transit lanes. Stride will use battery electric buses on all three lines, served from a new maintenance facility in Bothell.

History

Predecessors

A double-decker bus on Sound Transit Express route 532 at Bellevue Transit Center

The Interstate 405 (I-405) and State Route 522 (SR 522) corridors are served by Sound Transit Express bus routes that were launched in the late 1990s and early 2000s by Sound Transit to provide service between regional hubs. They replaced earlier King County Metro (formerly Metro Transit) bus routes from as early as the 1970s to provide inter-suburban service and bypass Downtown Seattle, the hub of the regional transit network. The first of these was Route 240, an all-day suburban route which launched in 1973 and served a 40-mile (64 km) corridor from Burien to Bothell with intermediate stops at Seattle–Tacoma International Airport, Southcenter Mall, and Bellevue. An express variant, Route 340, connected several park-and-ride lots on I-405 and SR 518 between Burien and Shoreline; it was the longest route in the Metro system, taking three hours on a round trip.

The south half of I-405 is served by Route 560, which travels from the Westwood Village shopping center in West Seattle to Burien, Seattle–Tacoma International Airport, Renton, and Bellevue. It was launched by Sound Transit in September 2000 and originally continued north to West Seattle Junction until the route was cut in 2013. The north half of I-405, from Bellevue to Lynnwood, is served by Route 535; the route has stops in northern Kirkland and at the University of Washington Bothell campus. The corridor is also served by Route 532, which continues to Everett. Both routes were part of the original Sound Transit Express launch in September 1999; route 535 has all-day service on weekdays and Saturdays, while route 532 is peak-only.

The SR 522 corridor from Seattle to Kenmore, Bothell, and Woodinville is served by Sound Transit Express route 522, which launched in September 2002. It replaced an earlier route operated by King County Metro, who continue to run a direct route from Kenmore and Bothell to the University of Washington campus in Seattle. Route 522 originally continued into Downtown Seattle until it was truncated to coincide with the opening of Roosevelt station in 2021.

BRT proposals and studies

I-405 was originally built as a bypass around Seattle, but had become heavily congested during peak hours after the development of Eastside cities in the late 20th century. A set of high-occupancy vehicle lanes (HOV lanes) were constructed along its entire length from 1983 to 2002 to address congestion issues and encourage the use of carpools and public transit. The Regional Transit Authority (now Sound Transit) planned to construct direct-access ramps for the HOV lanes to improve bus service on the corridor, as the existing network of flyer stops required buses to weave in and out of the other lanes. The ramps were funded by the Sound Move ballot measure, which was approved by voters in 1996, and intended to be a precursor to a bus rapid transit (BRT) system.

The conversion of the HOV lanes on I-405 for transit-only use or the construction of an adjacent facility was proposed as early as 1990 by Metro Transit (now King County Metro). A commuter rail line using the existing Eastside Rail Corridor, a former freight line that runs parallel to I-405, was also considered. The state government convened a 19-member committee in 2001 to draft a long-range plan for the I-405 corridor that would be used to recommend projects in future legislative funding packages. Sound Transit, a stakeholder in the committee, solicited ideas for a bus rapid transit system with grade-separated busways. The state committee endorsed the addition of managed high-occupancy toll lanes (HOT lanes) lanes that would also be used by a bus rapid transit system with park-and-ride stops spaced 2 to 3 miles (3.2 to 4.8 km) apart.

A statewide referendum to fund transportation projects, including the first phases of the I-405 expansion and improvements, was rejected by Washington voters in 2002. The BRT project was bundled into the unfunded phase of the corridor's master plan, which would take an estimated 20 years to construct with additional funding sources. Sound Transit updated their long-range plan in 2005 to add several BRT corridors, including I-405 from Renton to Bothell, and a high-capacity transit option on SR 522 that would be either rail or bus-based rapid transit. Funding to plan and design the I-405 BRT line was included by Sound Transit in their portion of the 2007 Roads and Transit package, which was defeated by voters in the Seattle area. The I-405 planning study was retained in the separate Sound Transit 2 ballot measure, which was approved by voters in 2008. Cities on the north side of Lake Washington had also unsuccessfully requested funds to study transit options for the SR 522 corridor in the package.

Sound Transit updated its long-range plan in 2014 to prepare for a proposed third expansion package for the regional transit system. It included BRT on the I-405 corridor, which was also designated for potential rail expansion, and an unspecified form of high-capacity transit on SR 522 and between Bothell and Kirkland. A grassroots citizens' group named "522 Transit Now!" formed to lobby for the inclusion of a rapid transit line on the SR 522 corridor in the expansion package. In August 2015, Sound Transit revised the preliminary list of projects in the package to include BRT on SR 522 alongside I-405 and the Eastside Rail Corridor. BRT on the Eastside Rail Corridor was removed from consideration in 2016 due to protests from Kirkland residents who lived near the Cross Kirkland Corridor, a section of the rail line that had been converted to a bicycle and walking trail. The Eastside Rail Corridor was instead included as a study corridor for a potential future package.

Approval and planning

Funding for a 45-mile (72 km) BRT system on I-405 and SR 522 was included in the Sound Transit 3 package, a major ballot measure in 2016 to expand Sound Transit services across the region. The BRT element would cost an estimated $3 billion in year-of-expenditure dollars and include 2,100 total parking spaces at various park-and-ride lots. The earlier draft of the plan had only allocated $341 million towards a BRT program, which was protested by Eastside cities, especially Renton. The Sound Transit 3 package was passed by voters in November 2016 and the BRT lines were initially scheduled to open in 2024. The I-405 lines would be contingent on completion of HOT lanes on the south half of the corridor, which was originally scheduled to begin in 2019 and finish in 2024. The Bellevue–Lynnwood HOT lanes had opened in 2015.

The BRT system was named Stride in 2018 and given its own branding, which would be reflected in bus liveries and station designs. In 2020, the individual lines were given alphanumeric designations—with S as a prefix to the number—to differentiate from existing BRT services in the region that use either letters or colors. Stride lines will be colored gold on Sound Transit maps. Preliminary engineering and planning began in early 2018 with contracts awarded to WSP USA and David Evans and Associates. A set of business access and transit lanes on SR 522 began construction in 2019 and was completed in 2022 for use by the future Stride S3 Line.

In 2019, Washington State Department of Transportation (WSDOT) began construction of Renton–Bellevue HOT lanes on I-405, which includes a rebuilt interchange for the Stride S1 Line. Sound Transit completed environmental review for the S1 and S2 lines (on I-405) in September 2020 and the S3 Line (on SR 522) in March 2021. The program was delayed by several years due to a systemwide budget shortfall caused by the COVID-19 pandemic. In the 2021 realignment of the Sound Transit 3 program, the openings for the Stride lines was revised to 2026 and 2027, with park-and-ride projects delayed further to 2034 and 2044. Sound Transit adopted the final alignments and stations for the Stride lines in September 2021, along with the site of the proposed bus base.

The $2.35 billion budget for the Stride program was approved by the Sound Transit Board in July 2023. The scheduled opening dates were delayed by another year due to increased project risks identified by Sound Transit. The first major project, the three-level Northeast 85th Street interchange and station in Kirkland, began construction in September 2023. It replaces an existing cloverleaf interchange east of downtown Kirkland with two roundabouts that segregate HOT lane traffic and include stops for an intersecting RapidRide line. The S3 Line on SR 522 and S1 Line on the south half of I-405 are scheduled to open in 2028; the S2 Line on the north half of I-405 is scheduled to open in 2029. The Stride system is projected to carry 19,200 to 25,800 passengers on the I-405 corridor.

Lines

Stride is planned to have three lines that cover a total distance of 46 miles (74 km), primarily within the Eastside region in King County and part of neighboring Snohomish County. Buses will operate for 19 hours a days on weekdays and Saturdays and for 17 hours on Sundays; frequencies would range from 10 minutes during peak hours to 15 minutes at other times. The system's 25 stations will include large shelters, off-board fare payment, ticket vending machines, and real-time information screens. Several stations will also have park-and-ride facilities and storage for bicycles.

The S1 Line serves the southern half of the Interstate 405 and State Route 518 corridor; the line begins in Burien and travels through three intermediate stations before reaching its terminus at Bellevue Transit Center. The S2 Line serves the northern half of Interstate 405 from Bellevue to Lynnwood City Center station with five intermediate stations. The S3 Line would follow portions of State Route 523 and State Route 522 around the north side of Lake Washington from Shoreline South/148th station to Bothell; it would stop at twelve intermediate stations. Connections to the Link light rail system will be available on all three lines. The Stride lines are expected to have end-to-end travel times that average 20 minutes faster than existing express bus routes on those corridors.

Stations

List of Stride stations
Station Line(s) City Connections and notes
15th Ave NE Seattle / Shoreline
30th Ave NE Seattle / Shoreline
61st Ave NE Kenmore
68th Ave NE Kenmore
98th Ave NE Bothell
104th Ave NE Bothell
165th Street Lake Forest Park
Ballinger Way Lake Forest Park
Beardslee Blvd Bothell
Bellevue Transit Center Bellevue Link light rail Link light rail: 2 Line
Bothell/Woodinville Transit Center Bothell
Brickyard Kirkland
Burien Transit Center Burien
Canyon Park Bothell
Kenmore Park & Ride Kenmore
Kirkland/NE 85th Kirkland
Lynnwood City Center Lynnwood Link light rail Link light rail: 1 Line, 2 Line
NE 153rd Street Lake Forest Park
Renton/NE 44th Renton
Renton Transit Center Renton
Shoreline South/148th Shoreline Link light rail Link light rail: 1 Line, 2 Line
Totem Lake Kirkland
Tukwila International Blvd Tukwila Link light rail Link light rail: 1 Line
UW Bothell/Cascadia College Bothell

Operations

The sole operations and maintenance facility for Stride is Bus Base North, located in the Canyon Park neighborhood of Bothell. The 10-acre (4.0 ha) campus is planned to have a two-story bus maintenance building with washing and refueling areas, a two-story garage, and an operations and control center. It has a listed capacity of 120 buses, which will include all Stride buses and some Sound Transit Express buses used in Snohomish County. The Canyon Park site was selected by Sound Transit in 2021 from a pool of thirty candidates. It is scheduled to open in late 2027.

Fleet

Stride is planned to use a fleet of 48 battery electric buses with wireless inductive chargers embedded into the roadway at layover facilities. The inductive chargers, produced by InductEV, are able to deliver 300 kW of electricity; conventional 180kW plug-in chargers will be used at Bus Base North. The S1 and S2 lines on Interstate 405 will use 33 Enviro500EV electric double-decker buses produced by Alexander Dennis at a cost of $73.2 million. The buses have additional seating compared to a conventional model and are similar to double-deckers already used on the northern Interstate 405 corridor. The S3 Line will use 14 articulated buses due to its more frequent stops; the BYD RIDE K11M was selected for a $33.5 million contract in 2023.

References

  1. "Stride Spring Engement Summary" (PDF). Sound Transit. May 2023. p. 5. Retrieved January 16, 2025.
  2. ^ "2018 Service Implementation Plan" (PDF). Sound Transit. December 2017. pp. 135–137, 141–149, 187–191. Retrieved January 9, 2025.
  3. Lane, Bob (September 22, 1974). "Transit is significant suburban improvement". The Seattle Times. p. C3.
  4. "Bus Links Bothell, Burien". Seattle Post-Intelligencer. May 5, 1973. p. B7.
  5. Wilson, Marshall (February 18, 1981). "Metro tries to break off Bellevue's love affair with car". The Seattle Times. p. G7.
  6. Broom, Jack (September 1, 1994). "'Human bus schedule' rides again...and again". The Seattle Times. p. A1. Retrieved January 11, 2025.
  7. Lindblom, Mike (May 25, 2016). "Renton tired of paying a lot, getting few buses, no light rail from Sound Transit". The Seattle Times. Retrieved January 9, 2025.
  8. "Sound Transit Route 560 (with service to SeaTac Airport) changes kick in June 8". West Seattle Herald. January 4, 2013. Retrieved January 9, 2025.
  9. Slager, Melissa (January 26, 2016). "I-405 tolls are shaving several minutes off bus riders' commutes". The Everett Herald. Retrieved January 9, 2025.
  10. Singer, Natalie (September 25, 2002). "Commuters along for the (new) ride". The Seattle Times. p. B2.
  11. Lindblom, Mike (September 28, 2021). "Roosevelt light-rail station fuels rapid growth in North Seattle neighborhood". The Seattle Times. Retrieved January 11, 2025.
  12. Whitely, Peyton (January 3, 2003). "Eastside history: I-405 radically altered life east of the lake". The Seattle Times. Retrieved January 14, 2025.
  13. Foster, George (April 5, 1996). "Express service: RTA plan eases access to bus, car-pool lanes". Seattle Post-Intelligencer. p. C1.
  14. Lindblom, Mike (March 27, 2002). "Bellevue I-405 project to bring hassles, then a smoother drive". The Seattle Times. p. A1.
  15. Foster, George (March 20, 1996). "$3.7 billion transit plan, minus lots of rail, in works". Seattle Post-Intelligencer. p. B1.
  16. Haberstroh, Joe (September 28, 1990). "Metro faces tough transit choices". The Seattle Times. p. B3.
  17. Ervin, Keith (November 20, 2008). "Eastside passenger railway would cost $1 billion". The Seattle Times. Archived from the original on July 15, 2011. Retrieved January 14, 2025.
  18. Foster, George (March 20, 2001). "A $7 billion fix for the I-405 nightmare". Seattle Post-Intelligencer. p. A1.
  19. Lindblom, Mike (November 15, 2001). "Panel to endorse more I-405 lanes". The Seattle Times. p. B1.
  20. I-405 Corridor Program Record of Decision (PDF) (Report). U.S. Department of Transportation. October 2002. pp. 15–16. Retrieved January 15, 2025 – via Washington State Department of Transportation.
  21. Hadley, Jane (December 13, 2002). "Little hope of money for roads". Seattle Post-Intelligencer. p. B1.
  22. Singer, Natalie (September 18, 2003). "I-405 upgrade gets up to speed". The Seattle Times. p. B3.
  23. Hadley, Jane (October 14, 2005). "Expanded light rail plan envisioned for region". Seattle Post-Intelligencer. p. B2.
  24. "Sound Transit Regional Transit Long-Range Plan" (PDF). Sound Transit. July 7, 2005. pp. 11–14. Retrieved January 15, 2025.
  25. "Sound Transit 2: The Regional Transit System Plan for Central Puget Sound" (PDF). Sound Transit. May 2007. p. 16. Archived from the original (PDF) on December 16, 2007. Retrieved January 15, 2025.
  26. Garber, Andrew (November 7, 2007). "Huge roads-transit plan gets trounced". The Seattle Times. p. A1. Retrieved January 15, 2025.
  27. "Sound Transit 2: A Mass Transit Guide" (PDF). Sound Transit. July 2008. p. 13. Retrieved January 15, 2025.
  28. Sheets, Bill (November 9, 2008). "Where $17 billion takes you: Buses will arrive first". The Everett Herald. p. A12. Retrieved January 15, 2025 – via Newspapers.com.
  29. Hicks, Joshua (May 21, 2008). "Northshore area included in transit-expansion plan". Bothell-Kenmore Reporter. Retrieved January 15, 2025.
  30. "Regional Transit Long-Range Plan" (PDF). Sound Transit. December 2014. p. 12. Retrieved January 15, 2025.
  31. Lindblom, Mike (July 4, 2015). "Sound Transit planning heats up for light-rail expansion and public vote". The Seattle Times. Retrieved January 15, 2025.
  32. Isaacs, Deanna (July 1, 2015). "City of Kenmore officials push for more access to light rail". Bothell-Kenmore Reporter. Retrieved January 16, 2025.
  33. "Sound Transit Board Meeting Summary Minutes: August 27, 2015" (PDF). Sound Transit. September 24, 2015. p. 5. Retrieved January 16, 2025.
  34. Cornfield, Jerry (August 31, 2015). "Sound Transit's wish list of Snohomish County projects grows". The Everett Herald. Retrieved January 16, 2025.
  35. Howard, John William (March 30, 2016). "Draft plan for ST3 does not include transit on Kirkland trail". Kirkland Reporter. Retrieved January 16, 2025.
  36. Kunkler, Aaron (July 1, 2016). "ST3 will include light rail to South Kirkland Park and Ride". Kirkland Reporter. Retrieved January 16, 2025.
  37. Lindblom, Mike (November 1, 2016). "Proposed light-rail expansion includes 8,560 park-and-ride stalls — but is it enough?". The Seattle Times. Retrieved January 16, 2025.
  38. "Sound Transit 3 Appendix A: Detailed Description of Facilities and Estimated Costs" (PDF). Sound Transit. June 2016. p. A2. Retrieved January 16, 2025.
  39. Lindblom, Mike (May 25, 2016). "Renton tired of paying a lot, getting few buses, no light rail from Sound Transit". The Seattle Times. Retrieved January 16, 2025.
  40. Lindblom, Mike (November 14, 2016). "Where Sound Transit 3 projects could speed up or slow down". The Seattle Times. Retrieved January 9, 2025.
  41. Giordano, Lizz (May 1, 2018). "Sound Transit kicks off planning for I-405 bus rapid transit". The Everett Herald. Retrieved January 16, 2025.
  42. Lee, Jessica (December 25, 2017). "I-405 express toll lanes between Renton and Bellevue are on their way". The Seattle Times. Retrieved January 9, 2025.
  43. "I-405 Bus Rapid Transit Phase 1 Project Refinements Executive Summary" (PDF). Sound Transit. March 2019. pp. 4–6, 12–16. Retrieved January 16, 2025.
  44. "Sound Transit Board approves 2019 budget with focus on system expansion projects" (Press release). Sound Transit. December 20, 2018. Retrieved January 16, 2025.
  45. "Transit line naming: Frequently asked questions (FAQs)" (PDF). Sound Transit. April 2020. p. 7. Retrieved January 16, 2025.
  46. Minnick, Benjamin (February 26, 2018). "ST picks firms to plan two BRT corridors that will cost $1.3B". Seattle Daily Journal of Commerce. Retrieved January 16, 2025.
  47. "Celebration Held for SR 522 Stage 3 Project Completion" (Press release). City of Bothell. July 21, 2022. Retrieved January 16, 2025.
  48. "Flatiron-Lane JV gets $705M I-405 contract". Seattle Daily Journal of Commerce. August 22, 2019. Retrieved January 16, 2025.
  49. Miller, Victoria (September 24, 2020). "Renton to Bellevue construction on I-405 continues to ramp up this fall". WSDOT Blog. Washington State Department of Transportation. Archived from the original on October 18, 2020. Retrieved January 16, 2025.
  50. ^ "Sound Transit Board selects Stride BRT projects to be built" (Press release). Sound Transit. September 28, 2021. Retrieved January 16, 2025.
  51. Lindblom, Mike; Baruchman, Michelle (August 15, 2021). "Sound Transit faces a $6.5 billion shortfall. Here's what it might do". The Seattle Times. Retrieved January 9, 2025.
  52. "Realigned Capital Program" (PDF). Sound Transit. August 12, 2021. Retrieved January 16, 2025.
  53. ^ "Sound Transit sets baseline budget, schedule for Stride Bus Rapid Transit" (Press release). Sound Transit. July 27, 2023. Retrieved January 9, 2025.
  54. "Sound Transit Resolution No. R2023-18 Staff Report" (PDF). Sound Transit. July 2023. p. 2. Retrieved January 16, 2025.
  55. "Sound Transit, WSDOT mark start of Kirkland interchange/BRT project". Seattle Daily Journal of Commerce. September 22, 2023. Retrieved January 9, 2025.
  56. Lindblom, Mike (September 6, 2018). "Sound Transit is taking a $300 million gamble on a new I-405 bus station in Kirkland". The Seattle Times. Retrieved January 16, 2025.
  57. ^ "2024 Annual Program Review Report" (PDF). Sound Transit. October 2024. pp. 27, 66, 76–77, 88. Retrieved January 9, 2025.
  58. Lindblom, Mike (January 28, 2022). "I-405 drivers to get triple-deck interchange at Kirkland". The Seattle Times. Retrieved January 17, 2025.
  59. ^ "Sound Transit Motion No. M2024-22" (PDF). Sound Transit. May 9, 2024. Retrieved January 9, 2025.
  60. ^ "Stride bus rapid transit: Frequently asked questions" (PDF). Sound Transit. July 2023. Retrieved January 9, 2025.
  61. ^ "I-405 Bus Rapid Transit SEPA Environmental Checklist" (PDF). Sound Transit. September 2020. pp. 9–10. Retrieved January 9, 2025.
  62. "SR 522/NE 145th BRT: Frequently Asked Questions" (PDF). Sound Transit. May 2018. Retrieved January 9, 2025.
  63. "Stride bus rapid transit online open house". Sound Transit. February 2023. Archived from the original on February 28, 2023. Retrieved January 9, 2025.
  64. "BRT Program: Stride BRT Program Update and Start-Up Activities" (PDF). Sound Transit. July 15, 2022. pp. 4–7, 10–12. Retrieved January 9, 2025.
  65. Lindblom, Mike (May 15, 2023). "Lake Forest Park neighbors denounce bus-lane plan that removes trees". The Seattle Times. Retrieved January 9, 2025.
  66. "Sound Transit Motion No. M2024-58" (PDF). Sound Transit. September 26, 2024. Retrieved January 14, 2025.
  67. ^ "Stride S3 Line folio" (PDF). Sound Transit. September 2024. Retrieved January 14, 2025.
  68. ^ "Stride S1 Line folio" (PDF). Sound Transit. September 2024. Retrieved January 14, 2025.
  69. ^ "Stride S2 Line folio" (PDF). Sound Transit. September 2024. Retrieved January 14, 2025.
  70. ^ Minnick, Benjamin (August 30, 2021). "Sound Transit picks Canyon Park as the site for $290M bus base". Seattle Daily Journal of Commerce. Retrieved January 9, 2025.
  71. "Supercharged – Battery electric buses will power the Stride Program". The Platform. Sound Transit. June 13, 2024. Retrieved January 9, 2025.
  72. Didion, Alex (March 5, 2024). "Double-decker buses with wireless charging capabilities coming to Sound Transit". KING 5 News. Retrieved January 9, 2025.
  73. ^ "Sound Transit Motion No. M2023-65 Staff Report" (PDF). Sound Transit. August 2023. pp. 1–3. Retrieved January 9, 2025.
  74. ^ "Stride BRT Fleet Procurement: M2023-65 + M2023-66" (PDF). Sound Transit. August 10, 2023. pp. 4–8. Retrieved January 9, 2025.
  75. "Sound Transit orders 33 Alexander Dennis Enviro500EV electric double deckers with next-generation technology for Stride BRT" (Press release). Alexander Dennis. February 12, 2024. Retrieved January 9, 2025.

External links

Mass transit in the Puget Sound region
Transportation in Seattle
Local and express bus
Light rail
Streetcar
Commuter rail
Bus rapid transit
Ferry
Monorail
People mover
Historic
Other
Italics denote lines or services which are planned, under construction, defunct, or otherwise not operating at the present time.
Currently operating bus rapid transit systems in the United States
Alabama
California
Colorado
Connecticut
Florida
Illinois
Indiana
Kentucky
Maryland
Massachusetts
Michigan
Minnesota
Missouri
Nebraska
Nevada
New Jersey
New Mexico
New York
Ohio
Oklahoma
Oregon
Pennsylvania
Texas
Utah
Virginia
Washington
Wisconsin
Buses portal • flag United States portal
Categories:
Stride (bus rapid transit) Add topic