Misplaced Pages

Green Line (Tel Aviv Light Rail)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Proposed light rail line in Tel Aviv For other uses, see Green Line.
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Green Line" Tel Aviv Light Rail – news · newspapers · books · scholar · JSTOR (October 2017) (Learn how and when to remove this message)
Green Line
Overview
StatusUnder construction
LocaleTel Aviv, Rishon LeZion, Holon, Herzliya
Stations58
Websitewww.nta.co.il
Service
TypeLight rail interchange Light rail
SystemTel Aviv Light Rail Tel Aviv Light Rail
Services2
Operator(s)NTA
Rolling stockAlstom Citadis
History
Planned opening2028 (estimated)
Technical
Line length35 km (22 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1500 V DC OHLE
Operating speed50 km/h (31 mph) in Street Level
70 km/h (43 mph) Underground
Route map

Legend
Herzliya railway station Abba Eban
Neveh Sharet
 
HaHoshlim Dvora HaNevi'a
Altneuland HaNehoshet
Hof HaTkhelet North HaBarzel
Hof HaTkhelet South Pinchas Rosen Bnei Brak–Ramat HaHayal railway station
Unichman Stadium
Levinsky College North HaYarkon Park
Levinsky College South Gane HaTa'arukha Tel Aviv University railway station
Shoshanna Parsitz Rosenfeld
Azore Hen University
Propes Brodetsky
HaGush HaGadol Namir
Levi Eshkol
Einstein
Dov
Reading
Nordau
Arlosoroff West
Rabin
Kaplan
Carlebach (Red Line)
Levinski
Hizkiyahu
Kibbuts Galuyot
Abu Kabir
Gittit
Holon Junction Holon Junction railway station
Yad LaBanim
HaHistadrut HaNesi'im
Golda Krauze
Lavun Serlin
Begin Ge'ullim
Hayyim Sharon HeHarash
Laskov HaMelakha
Khet-500 Mifrats Shlomo
Sakharov HaMerkava
Avnei Choshen Holon Depot
Lishansky HaYovel
Rishon LeTziyon Moshe Dayan railway station Dayan Terminal Agricultural Center
This diagram:

The Green Line is the second section of a light rail system in the Tel Aviv metropolitan area, known as the Tel Aviv Light Rail, which is under construction. The line will run from Rishon LeZion northwards through Holon through central Tel Aviv and will split into two branches: One to Herzliya in the north, and one to Ramat HaHayal neighborhood in Tel Aviv in the northeast. The expected annual passenger forecast is 65 million.

NTA Metropolitan Mass Transit System Limited is including the design and boring of the Green Line's tunnels as part of Red Line's tunnels overall contract so that work on the Green Line's underground portion can commence immediately following the completion of the Red Line tunnels.


References

  1. "Tel Aviv light rail Green Line completion delayed until 2028". globes.co.il. 7 October 2021. Retrieved 6 February 2022.
  2. "About NTA". www.nta.co.il. Retrieved 1 May 2023.

External links

Israel Urban public transport networks and systems in Israel
Commuter rail
Metro
Light rail
Bus rapid transit
Funicular
Cable car
Italics: under construction or currently not operational


Stub icon

This Asian rapid transit article is a stub. You can help Misplaced Pages by expanding it.

Stub icon

This article about transport in Israel is a stub. You can help Misplaced Pages by expanding it.

Categories:
Green Line (Tel Aviv Light Rail) Add topic