Misplaced Pages

Chongqing–Kunming high-speed railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Railway line in China
Chongqing–Kunming
high-speed railway
渝昆高速铁路
Overview
StatusUnder construction
Termini
Service
Operator(s)China Railway High-speed
Technical
Line length699 km (434 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Minimum radiusNormal: 7,000 m (4.3 mi); difficult: 5,500 m (3.4 mi)
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed350 km/h (217 mph)
Maximum inclineNormal: 2%; difficult: 3%
Route map

Legend
km
Chongqing–Xi'an HSR to Xi'an East
Lanzhou–Chongqing railway to Lanzhou
link to Chongqing North, Shapingba
0 Chongqing West
Chongqing–Guiyang HSR to Guiyang North
Chongqing–Guiyang railway to Guiyang North
Chongqing West EMU depot
link to Chongqing–Wanzhou HSR
to Chongqing East
17 Jiulongpo
28 Jiangjin North
57 Yongchuan South
97 Luzhou East
Luzhou–Zunyi HSR to Zunyi
123 Luzhou
Mianyang–Luzhou HSR to Neijiang North
169 Nanxi
Chengdu–Yibin HSR to Chengdu East
193 Yibin East
207 Yibin
Yibin West
Chengdu–Guiyang HSR
Chengdu EastGuiyang East
Yibin EMU depot
242 Gaoxian
275 Yunlian
302 Yanjin South
340 Yiliang North
392 Zhaotong East
Zhaotong–Weining ICR to Liupanshui
477 Yiche
522 Huize
588 Tianba
637 Xundian
Shanghai–Kunming HSR to Shanghai Hongqiao
Songming
676 Songming
700 Changshui Airport Kunming Changshui International Airport
link to Kunming West, Kunming
731 Kunming South
Nanning–Kunming HSR to Nanning
Kunming–Yuxi–Hekou railway to Yuxi
km
This diagram:

The Chongqing–Kunming high-speed railway (Chinese: 渝昆高速铁路) is a high-speed railway line currently under construction in China. The line, which runs from Chongqing West to Kunming South, will be part of the Beijing–Kunming corridor. The line will be 699 kilometres (434 mi) long and have a maximum speed of 350 kilometres per hour (220 mph).

Journey times from Kunming to Chengdu and Chongqing are expected to be around two hours.

Part of the line is the Yiliang tunnel, on the border of Yiliang County and Yanjin County, which would become the longest high-speed railway tunnel built for to a 350 km/h (217 mph) standard.

History

Construction on the Sichuan section began on 29 September 2019. Construction on the Yunnan section began on 20 December 2019.

Notes

  1. A new Songming station will be built on the Chongqing–Kunming HSR to the southwest of Songming station on the current Shanghai–Kunming HSR and the Shanghai–Kunming HSR will be rebuilt to run through the new station

References

  1. ^ "渝昆高铁云南段开工" [Construction starts on the Yunnan section of the Chongqing–Kunming high-speed railway] (in Chinese). gov.cn. 20 December 2019. Retrieved 20 April 2021.
  2. "世界最长高铁隧道进入主体施工_渝昆_彝良_建设". www.sohu.com. Retrieved 2022-09-23.
  3. "世界最长高铁隧道进入主体施工 | 每经网". www.nbd.com.cn. Retrieved 2022-09-23.
  4. "渝昆高铁四川段项目建设正式启动" [Construction starts on the Sichuan section of the Chongqing–Kunming high-speed railway] (in Chinese). 29 September 2019. Retrieved 20 April 2021.
Beijing–Kunming corridor
Beijing–Kunming,
Chongqing–Kunming
Beijing–Xiong'an
Xiong'an–Xinzhou (planned)
Datong–Xi'an
(Xinzhou–Taiyuan–Xi'an section)
see Template:Datong–Xi'an Passenger Railway
Xi'an–Chengdu
Chengdu–Yibin
Chongqing–Kunming (u/c)
Beijing–Taiyuan
Beijing–Zhangjiakou
Datong–Zhangjiakou
Datong–Xi'an
(Datong–Taiyuan section)
see Template:Datong–Xi'an Passenger Railway
Stub icon

This People's Republic of China rail-related article is a stub. You can help Misplaced Pages by expanding it.

Categories:
Chongqing–Kunming high-speed railway Add topic